No 1 London Wall – Fire Resistant Glazing

Project Value: £5,000,000
Main Contractor: St Robert McAlpine
Value: £400,000
Architect: Foster and Partners
Requirement: Secondary fire glazing to high rise London offices to complement existing structures
Scope:

Specially designed steel fire rated profiles needed to be created to visually line in with the existing external aluminium curtain walling. Additional structural bracing was fitted to the ceiling to allow for the very slender steel profiles. The FireLine secondary glazing opens to allow cleaning.

Contact Us

For directions to Fendor, or use to use our contact form, please click here.

T: 0191 417 0170
E: info@fendor.co.uk

Fendor Ltd
Spire House
Spire Road
Glover Industrial Estate
Washington
NE37 3ES

Make an enquiry

Drop us a line using the contact form below, and one of the team will be in touch soon.

Your Name (required)

Your Email (required)

Your Message

Input this code:
captcha

Latest News

Crittall becomes member of the SWA
2 August 2018

Crittall Windows Ltd is delighted to announce that we have joined the Steel Window Association (SWA), the industry trade body that represents the majority of UK producers in the sector.…

Read full story

Crittall Steel Window Meets Tough Specification
7 March 2018

Latest advancements in high performance Crittall steel window design have been successfully combined with traditional aesthetics to meet the exacting standards demanded by one of the United States’ major Ivy League universities.…

Read full story

DID YOU TUNE IN TO DIY SOS?
16 November 2017

It was such a privilege to be involved with the DIY SOS Swansea Big Build which aired last night on BBC1.…

Read full story